Events & Sports
Every medal, trophy and badge your event needs — guaranteed to arrive before the start line.
Korel Manufacturing provides race directors and event planners with one-stop medal and event merchandise manufacturing — finisher medals, trophies and badges guaranteed to arrive before the start line. Core products include finisher medals, age-group medals, champion trophies, volunteer badges and commemorative coins, all with in-house zinc alloy die-casting. Custom medals start at 500 units with 7–10 day sampling and 15–25 day production; event dates never move, so neither do our deadlines.
What is one-stop manufacturing for events & sports?
Hard deadlines are non-negotiable in sports. We produce premium in-house zinc alloy medals and deliver the full event package on time, every time.
Why choose Korel for your events & sports project?
Hard-deadline delivery guarantee
We plan production around your event date because the start line will not wait — and neither will we.
In-house zinc alloy for premium medals
Our own die-casting means finer detail, richer finishes and consistent quality across thousands of units.
Full event package, one delivery
Medals, trophies, badges, bib clips and bags arrive together, sorted and ready for race-day handout.
What are the MOQ, lead times and price ranges?
Reference ranges for planning. Exact pricing depends on size, finish and quantity — request a quote for a firm number.
| Product | MOQ | Sample Time | Production Time | Price Range (FOB) |
|---|---|---|---|---|
| Finisher medals (zinc alloy) | 500 pcs | 7–10 days | 15–25 days | $1.20–$5.00 / pc |
| Age-group medals | 100 pcs per group | 7–10 days | 15–20 days | $1.00–$4.00 / pc |
| Champion trophies (acrylic) | 50 pcs | 5–7 days | 10–15 days | $3.00–$15.00 / pc |
| Volunteer badges | 200 pcs | 5–7 days | 10–15 days | $0.50–$2.00 / pc |
| Commemorative coins | 500 pcs | 7–10 days | 15–20 days | $0.80–$3.50 / pc |
Stock adaptation or custom development — which is right for you?
Two proven paths. Use stock adaptation for speed and low minimums; use custom development for signature pieces that are exclusively yours.
| Dimension | Stock Adaptation | Custom Development |
|---|---|---|
| MOQ | 100–500 pcs | 500+ pcs |
| Sample time | 3–7 days | 7–15 days |
| Production time | 7–15 days | 15–30 days |
| Tooling / mold fee | None (existing molds) | $80–$300 per design |
| Exclusivity | Shared format, your artwork | Fully exclusive design |
| Best for | Fast restocks, seasonal refreshes, tight budgets | Signature pieces, flagship products, brand identity |
Why work with a factory that also kits — instead of a trading company?
We own our core production lines and coordinate the full material range. That means direct pricing, tighter quality control and one accountable partner.
| Dimension | Korel (Factory + Kitting) | Trading Company |
|---|---|---|
| Pricing | Direct factory cost, no middleman markup | 15–30% markup on top of factory price |
| Quality control | In-house QC at every production stage, <2% defect rate | Final inspection only, 3–5% typical defect rate |
| Lead time control | Direct scheduling, can prioritize and expedite | Dependent on factory queue, less visibility |
| Multi-material coordination | One PO covers zinc alloy + acrylic + paper + wood + plush | Often sources from multiple factories, coordination overhead |
| Communication | Direct to production team, technical questions answered same day | Goes through account manager, slower technical response |
| Customization depth | Can modify molds, finishes and packaging at source | Limited to what their supplier network offers |
What products ship in one delivery?
A representative product kit for this solution — every item matched to one quality standard and shipped together.
What quality standards and certifications apply?
We manufacture to internationally recognized standards. These are the same certifications and inspection methods major retailers and brands require.
EU REACH Compliance
All zinc alloy products meet EU REACH regulations with lead content below 0.01%, ensuring safe sale in the European market.
EU REACH Regulation (EC) No 1907/2006
AQL 2.5 International Inspection Standard
Every batch is inspected using the AQL 2.5 sampling standard (ISO 2859-1), the same standard used by major retailers and brands worldwide.
ISO 2859-1:1999 Sampling procedures for inspection by attributes
CPSIA Children's Product Safety
Products intended for children comply with CPSIA requirements for lead and phthalate content, with third-party test reports available on request.
US Consumer Product Safety Improvement Act (CPSIA) 2008
Industry Defect Rate Benchmark
The industry average defect rate for custom promotional products is 3–5%. Our in-house QC at every production stage keeps our rate below 2%.
Industry benchmark based on Promotional Products Association International (PPAI) quality reports
Frequently asked questions
The questions buyers ask most often — with concrete numbers and direct answers.
What is the minimum order for custom finisher medals?+
How long does it take to produce custom race medals?+
Can you guarantee delivery before my event date?+
What finishes and options are available for medals?+
How much do custom finisher medals cost?+
Do you offer a complete event package beyond medals?+
What other solutions do we offer?
Start your events & sports project
Tell us what you need and we will scope the full kit — one supplier, one delivery, one quality standard.
Get a Project Quote